1009sqm combined unit, New Germany, Pinetown
300amps 3 phase supply
Secure industrial premise with extremely efficient access to M1 and M19 highways.
Fully fenced with 24/7 on-site security and access control
Dual 5m roller shutter doors, high ceilings, and great natural light.
Practical layout with multiple receptions, offices and toilets as well as mezzanine levels with common areas and more offices.
Ample parking space and available for immediate occupation from January 2025.
1 ton per square meter load bearing
No articulated vehicles, but larger single trailer trucks can drive through comfortably.
There is a condition with the units at this property whereby an extended rent-free period is applicable after the repair costs to the internals are taken into account. This may come as a marked outlay at the beginning but will be returned as a 3-5 month rent free...
1009sqm combined unit, New Germany, Pinetown
300amps 3 phase supply
Secure industrial premise with extremely efficient access to M1 and M19 highways.
Fully fenced with 24/7 on-site security and access control
Dual 5m roller shutter doors, high ceilings, and great natural light.
Practical layout with multiple receptions, offices and toilets as well as mezzanine levels with common areas and more offices.
Ample parking space and available for immediate occupation from January 2025.
1 ton per square meter load bearing
No articulated vehicles, but larger single trailer trucks can drive through comfortably.
There is a condition with the units at this property whereby an extended rent-free period is applicable after the repair costs to the internals are taken into account. This may come as a marked outlay at the beginning but will be returned as a 3-5 month rent free period depending on quotations. These refurbishments include fresh wiring from the new DB board to the outlets. A full report will be provided on all internal features covered upon application, essentially bringing the unit back to a brand new state.
The 6 units of this building had all been vacant last year until October when 2 new companies moved into unit 5 & 6, an application is currently underway for unit 1 and will likely leave this remaining combination of 2&3 available as well as unit 4 of 500sqm.