Salt pans farm in the Free State.
Eskom: ± R6 000 per month.
Water rights go hand in hand with the Mining Permit.
Water is pumped to different dams for the Salt process.
19 Boreholes.
Pump water with compressors.
Power lines are self-tensioned.
Flood control is equipped.
Included: All Salt Packaging and Weighing Equipment.