Saxdowne Industrial Zone provides a strategic position for warehousing and distribution, light manufacturing and light industrial businesses close to Stellenbosch Arterial and the R300.
The development offers a standalone warehouse, a two-story north-facing office block, a yard and a parking area.
Perimeter fencing with controlled access/egress to the site will ensure a safe and secure environment.
The facility consists of the following:
- Land Size: 6 661m²
- Yard: 2 500 m²
- Guard House: 12 m²
- 16 x Parking Bays
- Three-Phase Power of 190 Amps
- Minimum Roof Clearance Height – 8,5m
- Completion Approximately 12 Months from OTP Signatures
Two Building Layout Options:
OPTION 1
One Large Warehouse
Warehouse Size: 4 112m²
Office Size: 300m²
Yard: 2 500m²
OPTION 2
Four Smaller Warehouses
Warehouse Size: 1 000m²
Office Size:...
Saxdowne Industrial Zone provides a strategic position for warehousing and distribution, light manufacturing and light industrial businesses close to Stellenbosch Arterial and the R300.
The development offers a standalone warehouse, a two-story north-facing office block, a yard and a parking area.
Perimeter fencing with controlled access/egress to the site will ensure a safe and secure environment.
The facility consists of the following:
- Land Size: 6 661m²
- Yard: 2 500 m²
- Guard House: 12 m²
- 16 x Parking Bays
- Three-Phase Power of 190 Amps
- Minimum Roof Clearance Height – 8,5m
- Completion Approximately 12 Months from OTP Signatures
Two Building Layout Options:
OPTION 1
One Large Warehouse
Warehouse Size: 4 112m²
Office Size: 300m²
Yard: 2 500m²
OPTION 2
Four Smaller Warehouses
Warehouse Size: 1 000m²
Office Size: 57m²
Yard: 2 500m² (Shared)
Ideally located in the Western Cape within the City’s leading industrial node, Saxdowne Industrial Zone will be highly visible and prominent, providing easy access to the freeway network and other major arterials.
This location and the developer’s commitment to sustainable design will position occupiers perfectly for sustained operational efficiencies.
The facility was designed for warehouse and distribution operations, requiring the efficient movement of goods and materials and an orderly workflow.
Completion is estimated to be in the third quarter of 2024.
Price excludes VAT.
Contact Quintin Van Der Merwe for more information or to schedule a viewing.